finishingbase's Journal
 
[Most Recent Entries] [Calendar View] [Friends]

Below are the 2 most recent journal entries recorded in finishingbase's InsaneJournal:

    Friday, July 8th, 2011
    3:42 pm
    Steps to Finishing a Basement Through Your Home
    Basement: Two out of three rooms, we have asked the Air Force are available. They have conducted several, unfortunately forgotten. The third room is empty, has a dry floor are the weekend and a washing machine. The water connection is still getüfftelt - my suggestions were rejected with cables across the room. The power is plugged in the box, unfortunately the cable alone did not crawl through the framing basement walls to their ends are still in boxes outlets - a pity. The favorite of my husband's unit in the basement is the part that shows him how much money he currently earned by the photovoltaic system. How man can be happy about € 18!

    EC: With the exception of the guest rooms have all steps to finishing a basement and ceiling plaster her on it. Looks great. Only at night, you should omit the lighting, because you work at filling our sloppy but can see now - ups.

    The bathroom is in the ground floor with shower, sink and toilet and complete (thanks to Papa-law) and became very beautiful. I need top actually none at all.
    Except the sofas we do not have any furniture. The packaged doors serve us as a gigantic living room table at the moment.

    DG: This is where every wall and ceiling have their "base" , not only the bathroom. We bought great brown carpet and installed no later than today evening all rooms and Waterproofing a Basement. The main room (Schlazi and office) have their furniture and are decorated.
    3:34 pm
    Steps to Finishing a Basement and Buildings
    The project is planned as a condominium housing tower vertical, consists of 38 apartments spread over 19 floors, stairwell and three elevators (one of the service) that connect the units with parking. The apartments are located from floor one to 19 framing basement walls and are ready only two per floor. They consist of a service area with vertical circulation, with stairs and elevator service, in addition to the main elevator lobbies downloaded apartamentos.Cuentan distribution to three bedrooms with bathroom and dressing room, a dining room space with a guest bathroom, family room, kitchen with pantry space, patio and utility room.

    As for the construction system of the project, the building has a reinforced concrete structure based on beams, columns and slabs with two large cast side, and a foundation based on concrete piles up to two meters in diameter and depth 22 meters. The whole facade is ventilated and facade elements are hung coating, screwed or stapled, since the facade is completely removable. This will create a steps to finishing a basement, weather that makes the building more efficient.
    It is important to note that this entire building is three-dimensional modules in feet, not to imitate other countries but because all the materials come in proportions of feet.


    As for finishes, used high quality materials both indoors and outdoors, as well as precast concrete and themselves apparent for a Waterproofing a Basement. He managed natural granites and tiles on floors according to their location in the apartments as well as granite, tiles and concrete apparent común.Dentro use areas of apartment walls were handled in finishes such as gypsum plaster ready for the finish, granite in bathrooms and kitchens, and tile in wet areas of services, as well as apparent in the finished concrete to the common areas. As for the finished plaster ceiling tiles are used or the use of false ceilings according to local specific type. On the other hand, the decorating front is the same as the materials used, since it is modular prefabricated for this purpose.
About InsaneJournal